Prologic LM Heavy Duty Long Leadclip w/pins & Tailrubber | 10pcs

  • Sale
  • Regular price £10.95


A safe lead clip system for use with extremely heavy leads ideal for big river fishing

  • Designed to release the lead should it become snagged
  • For use with size 8 swivel
  • The metal arm reduces twist, releases easier and is stronger for bigger leads
Item No. Pcs
 49889 10